Three Houses

18102_moulin_carron_dardilly_exterieur_07.jpg
Tertiary

Three Houses is a development comprising an existing building that has been fully renovated, alongside two new volumes offering large, flexible floors for office activities. The project has achieved several environmental certifications, including BREEAM Very Good, E+C, and E3C1, thanks in part to the use of timber framing, low-carbon concrete, and photovoltaic panels.

18102_moulin_carron_dardilly_exterieur_06.jpg
18102_moulin_carron_dardilly_exterieur_01.jpg
18102_moulin_carron_dardilly_exterieur_02.jpeg
18102_moulin_carron_dardilly_interieur_01.jpg

In detail

Two cranes were required for the construction of the two buildings and the renovation of the third.

  • Project Owner
    Spie Batignolles
  • Location
    68 Chem. du Moulin Carron, 69570 Dardilly, France
  • Construction cost
    €15MHT
  • Services
    MISSION COMPLETE, PRIVE
  • Construction cost
    €15MHT

Related projects

See all projects
architecture_footer.jpg
Lyon

25, Rue Saint Jérôme
69007 Lyon • France
+33 (0)4 78 28 51 30

See on maps
Alpes

6, allée des Joncs
73420 Drumettaz-Clarafond • France
+33 (0)4 79 34 36 25

See on maps
Bahrein

Sanabis - Euro Tower
7th FloorRoad 1010 Block 410 – Manama • Kingdom of Bahrain
+973 172 50 822

See on maps
Paris

39 rue des Vignoles
75020 Paris • France
+33 (0)1 53 17 91 00

See on maps