Architects of a world in motion
Three Houses is a development comprising an existing building that has been fully renovated, alongside two new volumes offering large, flexible floors for office activities. The project has achieved several environmental certifications, including BREEAM Very Good, E+C, and E3C1, thanks in part to the use of timber framing, low-carbon concrete, and photovoltaic panels.
In detail
Two cranes were required for the construction of the two buildings and the renovation of the third.
- Project OwnerSpie Batignolles
- Location68 Chem. du Moulin Carron, 69570 Dardilly, France
- Construction cost€15MHT
- ServicesMISSION COMPLETE, PRIVE
- Construction cost€15MHT