Earth Sciences Observatory

15156_eost_strasbourg_exterieur_04.jpg
EquipmentLaboratory

For this simple volume extension, the GBE process allowed for the casting of walls and their integrated insulation in a single operation on-site. This streamlined the construction process. Another notable feature was the connection of the extension to the existing building, particularly the technical areas of the laboratories and cleanrooms.

15156_eost_strasbourg_exterieur_03.jpg
15156_eost_strasbourg_exterieur_05.jpg
15156_eost_strasbourg_exterieur_01.jpg
15156_eost_strasbourg_exterieur_04.jpg

In detail

The remains of a Vauban wall were discovered during the excavation work prior to the start of the construction project.

  • Project Owner
    Université de Strasbourg
  • Location
    4 Rue Blaise Pascal, 67000 Strasbourg, France
  • Construction cost
    €8.5MHT
  • Certification
    Laboratoires L2
  • Built floor area
    4,415 m²
  • Renovated floor area
    5,800 m²
  • Services
    BASE + EXE

Related projects

See all projects
architecture_footer.jpg
Lyon

25, Rue Saint Jérôme
69007 Lyon • France
+33 (0)4 78 28 51 30

See on maps
Alpes

6, allée des Joncs
73420 Drumettaz-Clarafond • France
+33 (0)4 79 34 36 25

See on maps
Bahrein

Sanabis - Euro Tower
7th FloorRoad 1010 Block 410 – Manama • Kingdom of Bahrain
+973 172 50 822

See on maps
Paris

39 rue des Vignoles
75020 Paris • France
+33 (0)1 53 17 91 00

See on maps